Electric Power Rates Commercial/Industrial
AUB offers seven basic commercial rates, GSA, GSB, GSC, GSD, MSB, MSC and
MSD. GS denotes General Services and applies to commercial entities not
engaged in manufacturing, such as churches, schools, restaurants, retail
stores, etc. MS denotes Manufacturing Services. The differentiation
between the GS and MS classes is determined by the entity's Standard
Industrial Classification (SIC) code. Commercial rate qualification is
determined by the customer's kilowatt (kw) demand.
The GSA rate is for commercial accounts with a demand between 0 kw and 5,000
kw; GSB/MSB are for commercial/manufacturing accounts with a demand between
5,001 kw and 15,000kw; and GSC/MSC are for accounts with a demand between
15,001 kw and 25,000 kw.
Note: All rates per kWh in the commercial/industrial schedule below are AUB's base
rate. Each month, TVA announces a Fuel Cost Adjustment for the period, which is
added to the AUB base per-kWh rate.
General Power Rate - Schedule GSA:
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
NOTE: The FCA for GSA Part 1 is (.00574) Note that the FCA for February is negative.
|
Part 1: For customers whose peak demand is not more than 50 kW and monthly energy usage does not exceed 15,000 kWh.
|
|
Customer Charge:
|
$31.93 per month
|
|
Demand Charge:
|
no charge
|
|
Energy Charge:
|
$0.08781 per kWh per month
|
|
NOTE: The FCA for GSA Part 2 is (.00574) for the first 15,000 kwhrs
The FCA is (.00567) for Over 15,000 kwhrs
|
Part 2: For customers having a peak demand greater than 50 kW and less than or equal to 1,000 kW or monthly energy usage exceeds 15,000 kWh.
|
|
Customer Charge:
|
|
$162.74 per month
|
|
Demand Charge:
|
First 50 kW
|
$0.00 per kW per month
|
|
|
51 kW - 1000 kW
|
$14.93 per kW per month
|
|
Energy Charge:
|
First 15,000 kWh
|
$0.08667 per kWh per month
|
|
|
Over 15,000 kWh
|
$0.04638 per kWh per month
|
|
NOTE: The FCA for GSA Part 3 is (.00567)
|
Part 3: For customers having a peak demand greater than 1,000 kW and less than or equal to 5,000 kW.
|
|
Customer Charge:
|
|
$618.00 per month
|
|
Demand Charge:
|
First 1,000 kW
|
$17.12 per kW
|
|
|
Next 4,000 kW
|
$18.76 per kW
|
|
Energy Charge:
|
|
$0.04755 per kWh
|
|
General Power Rate - Schedule GSB:
For customers having a peak demand greater than 5,000 kW and less than or equal to 15,000 kW.
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
The FCA is $(.00569)
|
Customer Charge:
|
$1,500 per month
|
|
Demand Charge:
|
$15.40 per kW per month
|
|
Excess Demand*:
|
$15.40 per kW per month
|
|
Energy Charge:
|
First 620 kWh/kW
|
$0.04132 per month
|
|
|
Over 620 kWh/kW
|
$0.03372 per month
|
*Amount billing demand exceeds contract demand (in addition to base demand charge).
|
|
Reactive charges per kvar:
|
Lagging kvar
|
$1.46
|
|
|
Leading kvar
|
$1.14
|
|
Facilities charges:
|
|
161 kV and above
|
$0.00 per kW
|
|
Below 161 kV to 46 kV
|
$0.36 per kW
|
|
Below 46kV: first 10,000 kW
|
$0.93 per kW
|
|
Excess over 10,000 kW
|
$0.73 per kW
|
|
General Power Rate - Schedule GSC:
For customers having a peak demand greater than 15,000 kW and less than or equal to 25,000 kW.
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
The FCA is $(.00569)
|
Customer Charge:
|
$1,500 per month
|
|
Demand Charge:
|
$14.79 per kW per month
|
|
Excess Demand*:
|
$14.79 per month
|
|
Energy Charge:
|
First 620 kWh/kW
|
$0.04132/kWh per month
|
|
|
Over 620 kWh/kW
|
$0.03372/kWh per month
|
*Amount billing demand exceeds contract demand (in addition to base demand charge).
|
|
Reactive charges per kvar:
|
Lagging kvar
|
$1.46
|
|
|
Leading kvar
|
$1.14
|
|
Facilities Charge (Based on the contract demand):
|
|
161 kV and above
|
$0.00 per kW
|
|
Below 161 kV to 46 kV
|
$0.36 per kW
|
|
Below 46 kV: 1st 10,000 kW
|
$0.93 per kW
|
|
Excess over 10,000 kW
|
$0.73 per kW
|
|
General Power Rate - Schedule GSD:
For customers having a peak demand greater than 15,000 kW and less than or equal to 25,000 kW.
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
The FCA is $(.00569)
|
Customer Charge:
|
$1,500 per month
|
|
Demand Charge:
|
$18.24 per kW per month
|
|
Excess Demand*:
|
$18.24 per kW per month
|
|
Energy Charge:
|
$0.03314/kWh per month
|
*Amount billing demand exceeds contract demand (in addition to base demand charge).
|
|
Reactive charges per kvar:
|
Lagging kvar
|
$1.46
|
|
|
Leading kvar
|
$1.14
|
|
Facilities Charge (Based on the contract demand):
|
|
161 kV and above
|
$0.00 per kW
|
|
Below 161 kV to 46 kV
|
$0.36 per kW
|
|
Below 46 kV: 1st 10,000 kW
|
$0.93 per kW
|
|
Excess over 10,000 kW
|
$0.73 per kW
|
|
General Power Rate - Schedule MSB:
For customers classified with a Standard Industrial Classification code of 20 - 39 having a contract demand greater than 5,000 kW but not more than 15,000 kW and whose major use for power is for activities conducted at the delivery point serving that customer.
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
The FCA is $(.00569)
|
Part 1: If customer's metered demand for the month is not more than 5,000 kW:
|
|
Customer Charge:
|
$1,500.00 per delivery point per month
|
|
Demand Charge:
|
$13.27 per kW per month
|
|
Excess Demand*:
|
$13.27 per kW per month
|
|
Energy Charge:
|
First 620 kWh/kW
|
$0.03518 per month
|
|
|
Over 620 kWh/kW
|
$0.02870 per month
|
|
Part 2: If customer's metered demand for the month is greater than 5,000 kW:
|
|
Customer Charge:
|
$1,500.00 per delivery point per month
|
|
Demand Charge:
|
$12.59 per kW per month
|
|
Excess Demand*:
|
$12.59 per kW per month
|
|
Energy Charge:
|
First 620 kWh/kW
|
$0.03341 per month
|
|
|
Over 620 kWh/kW
|
$0.02728 per month
|
*Amount billing demand exceeds contract demand (in addition to base demand charge).
|
|
Reactive charges per kvar:
|
Lagging kvar
|
$1.46
|
|
|
Leading kvar
|
$1.14
|
|
Facilities Charge (Based on the contract demand):
|
|
161 kV and above
|
$0.00 per kW
|
|
Below 161 kV to 46 kV
|
$0.36 per kW
|
|
Below 46 kV: 1st 10,000 kW
|
$0.93 per kW
|
|
Excess over 10,000 kW
|
$0.73 per kW
|
|
General Power Rate - Schedule MSC:
For customers classified with a Standard Industrial Classification code of 20 - 39 having a contract demand greater than 15,000 kW but not more than 25,000 kW and whose major use for power is for activities conducted at the delivery point serving that customer.
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
The FCA is $(.00569)
|
Customer Charge:
|
$1,500.00 per delivery point per month
|
|
Demand Charge:
|
$11.98 per kW per month
|
|
Excess Demand*:
|
$11.98 per kW per month
|
|
Energy Charge:
|
First 620 kWh/kW
|
$0.03341 per month
|
|
|
Over 620 kWh/kW
|
$0.02728 per month
|
*Amount billing demand exceeds contract demand (in addition to base demand charge).
|
|
Reactive charges per kvar:
|
Lagging kvar
|
$1.46
|
|
|
Leading kvar
|
$1.14
|
|
Facilities Charge (Based on the contract demand):
|
|
161 kV and above
|
$0.00 per kW
|
|
Below 161 kV to 46 kV
|
$0.36 per kW
|
|
Below 46 kV: 1st 10,000 kW
|
$0.93 per kW
|
|
Excess over 10,000 kW
|
$0.73 per kW
|
|
General Power Rate - Schedule MSD:
For customers classified with a Standard Industrial Classification code of 20 - 39 having a contract demand greater than 25,000 kW and whose major use for power is for activities conducted at the delivery point serving that customer.
NOTE: The Energy Charges shown in the table below for this rate class are the base charges. Each month, a fuel cost adjustment is added by TVA to the base energy charge. Therefore, to arrive at the full energy charge per kilowatt hour, add this month's FCA to the base energy charge shown in the table below.
The FCA is $(.00569)
|
Customer Charge:
|
$1,500.00 per delivery point per month
|
|
Demand Charge:
|
$14.78 per kW per month
|
|
Excess Demand*:
|
$14.78 per kW per month
|
|
Energy Charge:
|
$0.02679 per kWh per month
|
*Amount billing demand exceeds contract demand (in addition to base demand charge).
|
|
Reactive charges per kvar:
|
Lagging kvar
|
$1.46
|
|
|
Leading kvar
|
$1.14
|
|
Facilities Charge (Based on the contract demand):
|
|
161 kV and above
|
$0.00 per kW
|
|
Below 161 kV to 46 kV
|
$0.36 per kW
|
|
Below 46 kV: 1st 10,000 kW
|
$0.93 per kW
|
|
Excess over 10,000 kW
|
$0.73 per kW
|
|
|
|